Food shop licence (SFA)
The operator applies on GoBusiness with a layout plan drawn to a metric scale, showing the kitchen equipment, exhausts, sinks and wash basins, and the boundary of the refreshment area. SFA reviews it within 7 working days. Its concurrence with the layout should come before sinks, hoods and exhausts are fixed in place, so the kitchen is built to the plan SFA saw.
MD Projects [prepares / submits / coordinates] this for you.
